Home / Applications

Applications

Six situations that come up over and over, and what usually works in each.

Home charging

Single-family homes with off-street parking.

A 7 kW single-phase wallbox covers most overnight charging. Where the supply is limited, load balancing protects the main fuse; where a fixed installation is impossible, a Mode 2 portable unit plugged into an existing socket is the practical answer.

See the range →

Apartment & shared parking

Blocks and shared garages with one supply.

The constraint is rarely the charger, it is the building supply. Wireless dynamic load balancing shares the available current between several charge points without new wiring, which is often the difference between a workable installation and none.

See the range →

Fleet depots

Vans, taxis and service fleets.

Vehicles that return to a known place overnight suit wallboxes; vehicles that must turn around in under an hour suit DC. Most depots end up with both, and scheduling matters more than peak power.

See the range →

Destination & retail

Hotels, car parks, retail and workplaces.

AC is enough for visitors who stay for hours. Where the site wants to attract drivers who are passing through, 60–120 kW DC with billing through your own backend is the usual configuration.

See the range →

Highway & public charging

Corridors and public sites.

Dual-gun cabinets from 120 kW to 240 kW, and split systems that pool power between guns so two vehicles charging together do not each get half the rated output. Above 400 kW, liquid-cooled cables keep the connector within temperature limits.

See the range →

Charger builders & integrators

OEMs assembling their own cabinets.

20 kW and 30 kW isolated modules above 96% efficiency, plus connectors and cables. Useful where you want a stable power stage supply while keeping your own enclosure and control design.

See the range →

What we need from you

to quote properly
Country of installationThis decides the connector standard and the certification position — it is the first question we ask.
Number of charge pointsNow and in two years' time. It changes the load balancing design and the supply sizing.
Available supplyMain fuse size, phases and spare capacity.
Vehicle dwell patternHow long vehicles stand still, and whether they need to leave quickly at peak times.
BillingWhether drivers or tenants have to be charged for sessions — that decides metering and backend requirements.

Send us a site and we will size it

Country, number of vehicles, dwell pattern and supply capacity is enough for a first recommendation.

WhatsApp